Should I use primer with the Loose Wire System?
If the heating element is being laid directly onto a plywood or concrete subfloor, use the primer supplied. Leave to dry for 2-3 hours until tacky, then lay the heating element. If an insulated or standard tile backer board is being used, no primer is needed. We recommend you use Warmup Insulation Boards.